Contract  Table of Contents

Article / 1 / 2 / 3 / 4 / 5 / 6 / 7 / 8 / 9 / 10 / 11 / 12 / 13 /

Letter of Understanding / 1 / 2 / 3 /

January 1, 2008 to December 31, 2010
MISSION HILL VINEYARDS (PLANT) 2008-2010
Please read the disclaimer.


LETTER OF UNDERSTANDING #1

Shift Utilization and Off Site Bottling
Notwithstanding the provision of Article 2.07, the parties agree that the production facilities at Westbank shall be utilized to the fullest extent possible on a day shift, afternoon shift basis, prior to any contracting out of work as contemplated in Article 2.07. Providing such maximization is achieved, the Company shall be permitted to contract out overflow work to other groups, after discussion with the Union. Wherever practicable preference for such work shall be given to Union firms.

With regard to the 1 litre and 2 litre PET Bottles currently being processed at HPI it is agreed that during the term of this Collective Agreement that the following guidelines will be observed:
  1. These products will be incorporated into the production schedules at Mission Hills Winery to maximize the utilization of the day and night shift operations. Any additional production of PET bottles required which is beyond the capabilities of these shifts may be done by outside groups.

  2. The production of bag in the box will not be factored into determination of shift utilization.

FOR THE COMPANY:	FOR THE UNION:

Mohamed Doma	        Gerry Bergunder
Dave Fallis		Brad Dahl
Erin Gaster		Dan Kneller
			Farrell Louie
			Rita Taylor



Back to: BREW300.ca Home Page.